Hey, working on a switch provisioning lab in my office. So far I have a 2post 6ft rack. Want to get up to 24 switches doing ZTP at the same time. So far I know I want a vertical PDU with short power cords & 48port provisioning switch, and a 24port console server. Looking at getting a bunch of these 1U shelves, make it easier to slide in switches without having to mount brackets. any other thoughts on building a provisioning lab?
No comments:
Post a Comment