I have to walk someone over the webex/phone to remove a 9300--48U from 1 stack to another. I've added to existing stacks and replaced failed switches within a stack but not all that comfortable with the provision commands or maybe I'm over thinking this.
1 - remove stacking cable, remove switch from rack
2 - no switch stack-member-number provision (switch # that we just removed)
2- console into switch we just removed (this probably will be painful walking this dude through this over the phone)#erase startup-config#reload
3 - rack switch in new-existing stack - connect stack cables - power on
4- after it joins the stack configure interfaces
edit: 16.9.4 code
Am I missing anything?
No comments:
Post a Comment