Hi Guys,
Noob question from a guy returning to R&S post 3-4 years as I have mainly moved to security roles in my organisation. But I have been handed a project where we are deploying few switches in customer's location. Mock up diag will be shared at the end of this post.
As we are deploying multiple layers of switches in their environment.
Currently, as per plan, TOR switch will connect to Core switch (Spine SW) in this new section in full mesh and same goes for L3 uplink with their existing switch.
Switch modes:
Tor SW | L2 Switch |
---|---|
Core Switch | L3 Switch (All L3 Vlans reside here) |
Uplink Info:
Tor to Core SW | L2 - Full Mesh uplink |
---|---|
Core to Existing NW switch | L3 - Single Vlan to be passed |
Mock Diagram:
Click here for network diagram
My query:
- How will I Achieve L3 uplink between Core and Exisiting NW SW with full mesh redundancy intact.