Hi all,
I know normally, on a new stack, you configure the switches to operate in stack mode, power them off, connect the cables, turn them on in order (master first).
What I don't know is - if I have an existing stack with two switches and I need to add a third, do I need to power off the current stack switches then power them all on in the order needed or can I leave the two existing ones on, shift the cables around (and add new cables) to include the new third switch then power on the third switch? I don't deal with stacking all that often so I want to make sure I'm doing it right before I add in the switch.
No comments:
Post a Comment