Just got a quote from a contractor that averages about $500 per drop for some access points and projectors we need to add our network. This is just to run about 30-40 ft from our wiring closets. We have drop ceilings in most locations and other floors have plenty of access so it's a pretty easy job. Everything terminates to Systimax wiring blocks.
It's been over a decade since we rewired the building to CAT 6 so maybe I'm behind the times, but $500 a drop seems pretty excessive to me even in downtown Boston.
Am I just behind the times or am I getting screwed?
No comments:
Post a Comment