Folks, want to explore doing a spine and leaf DC with Cisco Nexus 9364 as Spines and Cisco Nexus 93180YC-FX as Leaf switches. I want to replicate this setup I'm planning at Primary Data Centre to the DR site. Now between the Primary DC and DR site I have DWDM that can provide 100Gb interfaces. Question is: Should I put another set of Cisco Nexus switches above the Spine switches for doing this "WAN/ DWDM" connection or is it ok to connect the Spines together using DWDM fibre and the route directly between the Primary DC and DR site?