I can't find the documentation. After an 'install all' with a disruptive upgrade, does the switch do a 'reload' or a 'reload power-cycle'?
I'm trying to figure out if I have to reload it twice bc of "After a successful power sequence upgrade, you must switch off the power to the system and then, power it up"
No comments:
Post a Comment