Tuesday, September 28, 2021

Staging Area Setup (UAT)

Hi Guys, I have a requirement of setting up a staging area for test environment.

Basic requirement is

  • not have communication between Production and staging area.
  • Staging Area to reside on same L3 switch.
  • Actual requirement of /24 subnet no more than that. Utilization will not exceed more than 20 IP's

​

Current Setup:

  • 2 TOR Catalyst 9500 switch (acting as Core Switch) [Interconnected over 2 40G ports in LACP]
  • 1 Mgmt Catalyst 9200 switch.

​

Query:

  • How can I design a staging Area where these requirements get fulfilled.?

​

My Planning/Thoughts:

  • I am thinking to configure a separate VRF for staging area and keep the production network on global vrf and have separation in this way.

​

Any suggestions are welcome, thank you in advance.

Apologies, if this query seems a bit noob. I have taken a role of Lead recently and this part comes along with it.



No comments:

Post a Comment