https://www.youtube.com/watch?v=RiDilURqXJ0
Interesting style, gaps between racks increased to 10 inches, side by side patch panel to switch layout, 1u wire management between switches and patch panels, 5 ft patch cables, labels on patch panel and labels on the switch side of patch cable. Connect cables from bottom to top then add labels to the wire from top to bottom. Oh and leave a 1u space under the switch to account to the 2u patch panels.
No comments:
Post a Comment